David M Robinson Jewellers,
St. Anne Square, Manchester.

This project over 10 weeks and completed for handover in June 2019 – this involved a full decant and removal of the existing air conditioning and involved the installation of new Toshiba air conditioning equipment over two trading floors of the store in the St Anne’s Square of Manchester.

An intricate supply grille layout was adhered to in conjunction with the lighting with Air Diffusion supplying the grilles etc.

A comprehensive ventilation system was designed to the Rolex workshop and polishing rooms – all fully controlled via a bespoke designed control system and panel.

Customer

David M Robinson Jewellers

What We Did

Retail Design & Installation

Start Date

25th March 2019

Handover Date

3rd  June 2019

Related Projects